134 Service & Repair
Removal of the Main Control Valve
For this task, apply the following procedure:
1.
Place the packer and carrier panels in the “interrupted cycle” position.
2.
Move the packer panel control lever outward to
sweep the packer panel through the hopper
toward the home position. Stop the movement of the panel (move the control lever to the neutral
position) when
the panel becomes vertical (straight up and down).
MAIN CONTROL VALVE
INTERRUPTED CYCLE POSITION
CARRIER PANEL
PAC
K
ER PANEL
Содержание 2R-III
Страница 1: ...2R III MAINTENANCE MANUAL...
Страница 2: ......
Страница 3: ...2R III MAINTENANCE MANUAL...
Страница 5: ......
Страница 6: ......
Страница 20: ...10 Introduction...
Страница 42: ...32 Safety...
Страница 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Страница 66: ...56 Preventive Maintenance...
Страница 102: ...92 Troubleshooting...