106 Service & Repair
5.
Secure a nylon sling around the cylinder and attach
to a lifting device with a lifting capacity of
500
lbs (227 kg). Operate the hoist to snug the lifting cable
without applying strain to the
cylinder.
6.
Slowly operate the carrier panel lever inward to completely
retract the carrier cylinder piston rod.
This
will provide enough clearance to remove the cylinder.
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up Off
OPERATIONAL STATUS
Truck Off
PTO Disengaged
CARRIER
PANEL
LEVER
Содержание 2R-III
Страница 1: ...2R III MAINTENANCE MANUAL...
Страница 2: ......
Страница 3: ...2R III MAINTENANCE MANUAL...
Страница 5: ......
Страница 6: ......
Страница 20: ...10 Introduction...
Страница 42: ...32 Safety...
Страница 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Страница 66: ...56 Preventive Maintenance...
Страница 102: ...92 Troubleshooting...