8
Service & Repair
This chapter contains the instructions necessary for
the
repair and replacement of the main components of
the unit.
Before attempting any repair of the unit, become
thoroughly familiar with the operation instructions
(see Chapter 4 of the
Operator’s Manual
) and general
repair practices (see Chapter 3 of this manual). Also,
before performing any work on the unit, know and
observe all safety precautions listed in Chapter 2 of this
manual.
Description of Operating
Cylinders (Carrier and
Packer Panels)
The four double-acting hydraulic cylinders that
control
movement of the carrier and packer panels
during the
compaction cycle are called the “operating
cylinders”.
Warning!
There are some procedures in this chapter
that will require that the truck is running. In
these instances the operational status will
be indicated. Otherwise, make sure that
the truck is shut off and the keys are
removed. The pressure of the hydraulic
system and resulting movement of the
unit’s parts can cause serious injury or
death.
Содержание 2R-III
Страница 1: ...2R III MAINTENANCE MANUAL...
Страница 2: ......
Страница 3: ...2R III MAINTENANCE MANUAL...
Страница 5: ......
Страница 6: ......
Страница 20: ...10 Introduction...
Страница 42: ...32 Safety...
Страница 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Страница 66: ...56 Preventive Maintenance...
Страница 102: ...92 Troubleshooting...