Integral T process thermostats
72
Starting up
YAWE 0026 / 21/01/2019
4 s
after approx. 4 sec. the second point.
Take current reading on the meter and set it with
e.g. 1300 = 1.3 mA.
Take current reading on the meter and set it with
e.g. 1991 = 19.91 mA.
After calibration has been completed this display
appears again.
or
with standard voltage signal 0 - 10 V.
4 s
after approx. 4 sec. the second point.
Corresponding start values for voltage calibration are L
500 and H 9000 = 0.5 V and 9 V.
Take voltage reading on the meter and set it with