3.
fix the Pinto
head on side “A”
and on side “B” with the
screws to the mounting frame
and with the screws on the
side of the unit(make sure that
the unit is not moved during
the tighten process). The
screws should be sufficiently
tight to hold the unit for long
time.
4.
Power up the Pinto units at both
ends.
5.
Fine Adjustment is required after
the unit has been aligned with
the internal pointing device.
Fine alignment is applicable for
vertical and horizontal
orientations. These movements
must be done using the fine alignment screws Adjust first the horizontal
then the vertical screw as shown in
the photographs on this page. Adjust
these screws while watching the rear
panel LED lights. Illuminate as many
green LED power indication lights as
possible during the fine alignment
process, and follow your multimeter
display, to find the maximum of the
detector voltage.
6.
During this period described in the fifth step, try to avoid the saturation
LED. /Red light/
Horizontal Fine
Alignment screws
DON’T TRY TO DO MOVE
TWO HEADS AT THE
SAME TIME! The result
won’t be the same