LB Pinto 400 V3
29/22
3.1.1.4
Direct sunshine
To prevent the sun shining directly into the receiver optics, first one has to
determine the orientation of the link. Try to avoid East-West orientation
wherever it is possible. Examine both sides of the link at sunset and sunrise and
find a position where the sun cannot get behind any of the heads. Be aware that
the path of the sun is changing throughout the year.
3.1.1.5
Eye safety
There are no two installation spot of the same kind, the buildings or structures,
the available space and the accessibility of the place will be different in each
case. Nevertheless, as a general rule it is very important to select the installation
site so, that nobody can look directly into the transmitter. For this reason place
the head either so high (on the side wall of the building) or so close to the edge
of the building (on a parapet on the rooftop) that no person can approach it
accidentally and can get into the beam path. Set up barriers if necessary and put
warning signs at prominent places.
The laser heads are provided with all labels and hazard warnings required by the
standard. There are warning labels on both the left and right side of the
protective cover next to the optical window and there is a warning and an
informative label on the rear side of the laser head
3.2
Installation procedure
For installation purposes the Pinto units are factory Pre-Set for 400 meters.
Содержание LB Pinto E1
Страница 28: ...LB Pinto 400 V3 29 28...
Страница 29: ...LB Pinto 400 V3 29 29...