Page 26
Table 13.
Recovery Data
Recovery
Data
40°F
50°F
60°F
70°F
80°F
90°F
100°F
gph
gph
gph
gph
gph
gph
gph
1250
3188
2550
2125
1821
1594
1417
1275
1500
3780
3024
2520
2160
1890
1680
1512
1750
4463
3570
2975
2550
2231
1983
1785
2000
5160
4128
3440
2948
2580
2293
2064
2500
6450
5160
4300
3686
3225
2867
2580
22°C
28°C
33°C
39°C
44°C
50°C
56°C
L/h
L/h
L/h
L/h
L/h
L/h
L/h
1250
12049
9639
8033
6885
6024
5355
4820
1500
14288
11431
9526
8165
7144
6350
5715
1750
16868
13495
11246
9639
8434
7497
6747
2000
19504
15603
13003
11145
9752
8668
7802
2500
24380
19504
16253
13931
12190
10836
9752
Temperature Rise
Temperature Rise
Model
Model
4.D
Water Flow Recovery Data
SECTION 5
Piping
5.A Boiler Water Piping
5.A.1 Boiler Water Connections
NOTE: This unit must be installed in a closed pressure
system with a minimum of 12 psi (82.7 kPa) static
pressure at the boiler.
The water piping should be supported by suitable
hangers or floor stands. Do not support the piping with
this unit. The hangers used should allow for expansion
and contraction of pipe. Rigid hangers may transmit
noise through the system resulting from the piping sliding
in the hangers. We recommend that padding be used
when rigid hangers are installed. Maintain 1” (2.5 cm)
clearance to combustibles for all hot water pipes.
Suggested piping diagrams are shown in Figure 4
through Figure 7. These diagrams are meant only as
guides. Components required by local codes must be
properly installed.
Pipe the discharge of the relief valve (full size) to a drain
or in a manner to prevent injury in the event of pressure
relief. Install an air purger, air vent, expansion tank,
hydronic flow check valve in the system supply loop, and
any other devices required by local codes. The minimum
fill pressure must be 12 psig (82.7 kPa). Install shutoff
valves where required by code.
5.A.2 Cold Water Make-Up
1.
Connect the cold water supply to the inlet
connection of an automatic fill valve.
2. Install a suitable back flow preventer between the
automatic fill valve and the cold water supply.
3. Install shut off valves where required.
In some installations, a hot water heating boiler is
connected to heating coils located in an air handling
unit where the coils may be exposed to refrigerated air
circulation. In these cases, the boiler piping system must
be equipped with flow control valves or other automatic
means to prevent gravity circulation of the boiler water
during the cooling cycle.
A boiler installed above radiation level, or as required by
the authority having jurisdiction, must be provided with a
low water cutoff device either as a part of the boiler or at
the time of boiler installation.
LAARS Heating Systems
Содержание OMNITHERM ONH1250
Страница 4: ...LAARS Heating Systems...
Страница 53: ...Page 53 This page intentionally left blank The OMNITHERM...