Page 88
49
24 VAC voltage low/high
H
1. Check the module and display connections.
2. Check the module power supply and make
sure that frequency, voltage and VA meet the
specifi cations.
50
Modulation fault
H
Internal sub-system fault.
1. Review alert messages for possible trends.
2. Correct possible problems.
51
Pump fault
H
Internal sub-system fault.
1. Review alert messages for possible trends.
2. Correct possible problems.
52
Motor tachometer fault
H
Internal sub-system fault.
1. Review alert messages for possible trends.
2. Correct possible problems.
53
AC input phases reversed
L
1. Check the module and display connections.
2. Check the module power supply and make
sure that both frequency and voltage meet
the specifi cations.
3. On 24 VAC applications, assure that J4
terminal 10 and J8 terminal 2 are connected
together.
59
Internal Fault: Mux pin shorted
L
Internal Fault.
1. Reset module.
2. If fault repeats, replace module.
61
Anti short cycle
H
Will not be a lockout fault. Hold Only.
62
Fan speed not proved
H
63
Rollout switch, is regarding the
SAFETY CHAIN
(OFF)
Could be one of the following:
Flow Switch (Standard Equipment
Sizes 399 and Up)
Additional High Limit (Field Supplied)
Optional Pressure Switch (Size 399
Only)
Low Water Cut Off (Standard
Equipment on All CSD-1 Models)
Low Gas Pressure Switch – Inlet
Side of Gas Valve (Standard
Equipment on All CSD-1 Models)
High Gas Pressure Switch – Outlet
Side of Gas Valve (Standard
Equipment on All CSD-1 Models)
Condensate Level Switch – All
Models
H
1. Reset the low gas pressure valve and the high
gas pressure valve.
2. Check for power at Terminal Block 8 (TB8 for
the ‘Safety Chain’ components.
3. Check wiring and correct any faults.
4. Check all safety interlocks connected to the
safety circuit to assure proper function.
5. If code persists, contact Tech Support.
Code
Description
Lockout
or Hold
Procedure
LAARS Heating Systems
Содержание Neotherm NTH
Страница 4: ...LAARS Heating Systems...
Страница 36: ...Page 36 Figure 22 Hydronic Piping Single Boiler Zoning with Circulators LAARS Heating Systems...
Страница 52: ...Page 52 Figure 36 Ladder Diagram 7 H Ladder Diagram LAARS Heating Systems...
Страница 100: ...Page 100 Parts Illustration 4 Internal Components Sizes 750 850 LAARS Heating Systems...
Страница 102: ...Page 102 Parts Illustration 6 Gas Train Components Sizes 600 850 LAARS Heating Systems...
Страница 103: ...Page 103 Parts Illustration 7 Heat Exchanger Components 68A Sizes 285 NEOTHERM Commercial Boilers and Water Heaters...