English
9 EN
USE
10. Daily Switch-On
“Before using the machine make sure that:
- the main electricity supply ON/OFF switch
is ON
- The water in the reservoir must be at
the maxium level.".
Switch on the mains switch (
1
); Led (
23
) “machine on”
will flash.
If the water level in the boiler is below minimum, the “boiler
level” (
11
) lamp will light and the boiler will fill to the correct
level (lamp
11
off).
At this point, the “
Heating phase
” starts, at the end of
which led (
23
) remains lit, indicating that the machine is
ready to be used.
At the end of the working day, switch off the mains switch (
1
).
11. Heating phase
During heating, if one of the coffee dispensing switches
(
16, 17, 18, 19
or
20
) is pressed, the machine dispenses
a coffee at the temperature reached at the time.
The heating phase is completed when the boiler manometer
pointer (
14
) is stabilized in the green area and led (
23
)
remains lit.
At this point, the machine is ready to dispense coffee,
steam and hot water.
To ensure harmonization between the temperature of the
group and that of the filter carrier (
10
), press the START-
STOP button (
20
) and allow to dispense for a few seconds,
then press button (
20
) again.
12. Delivery of the coffee
Remove the filter carrier, empty the old coffee grounds and
fill with 1 or 2 doses of ground coffee, according to the filter
carrier capacity.
Level off the ground coffee using the doser-grinder press.
Remove any ground coffee residue from the edge of the filter.
Insert the filter carrier (
10
) into the group, ensuring it is
well fastened in place. Position the cup (or cups) under
the spout (or spouts) of the filter carrier (
10
).
The dosed dispensing of the coffee can be done in these ways:
1.
normal
: press the coffee dispensing button (
16, 17, 18
or
19
) according to the desired dose. Dispensing will
stop automatically;
2.
preinfusion
: keep button (
16, 17, 18
or
19
) pressed
for about 1 second; pre-infusion is activated and after
about 4 seconds the delivery begins according to the
desired dose.
The pre-infusion is indicated by the led (
22
).
Press the START-STOP (
20
) button for continuous
dispensing. (max. 60 sec.)
Both dosed and continuous dispensing can be stopped at
any time by pressing the START-STOP button (
20
).
Do not remove the
coffee filter before the
coffee dispensing has
completed.
23
1
11
7
10
14
20
9
20
18
17
19
16
22
Содержание M21 Junior DT/1
Страница 3: ...I I ...
Страница 6: ...IV IV M21 Junior 2 16 17 20 19 18 7 1 15 2 6 10 9 8 14 11 22 23 ...
Страница 84: ...X ...
Страница 87: ......