English
5 EN
5. Installation Check-up
WATER CONNECTIONS
• No leaks from the connections or tubes
FUNCTIONING
• Boiler and operating pressures are normal.
• The pressure gauge is working properly.
• The self-leveling device is working properly.
• The expansion valves are working properly
GROUPS
•
Hook up the filter holders to the groups (without coffee).
• Let each group dispense water for about a minute.
HOT WATER
• Continuously dispense hot water (pressing the appropriate button) until at least 1 liter of water have been used
(see the “Hot water dispensing” chapter in the User’s Manual).
STEAM
• Dispense steam from the nozzles for about a minute, using the appropriate buttons.
WARNING
: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see
the Installation Module C).
WARNING
: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
Содержание M21 Junior DT/1
Страница 3: ...I I ...
Страница 6: ...IV IV M21 Junior 2 16 17 20 19 18 7 1 15 2 6 10 9 8 14 11 22 23 ...
Страница 84: ...X ...
Страница 87: ......