3 Commissioning
3 Commissioning
3 COMMISSIONING
Only qualified specialists should commission the pellet boiler.
Before you can start the commissioning process, installation of the boiler system and installation of the hydraulic
system must be concluded.
Check whether the installation and establishment of all connections (water, chimney, electrical) have been properly
executed in accordance with section 2 “System installation”.
If the fuel storage room or the storage container has not yet been adequately filled with fuel, complete this task as
specified in point 4.3 – “Filling / adding fuel” of the operating manual.
If all prerequisites are satisfied, ensure that the entire heating system is filled with water and that the heat can be
dissipated. If this is the case you can start the commissioning process.
3.1
Switching on the main switch
The main switch of the system is under the boiler cover on the front of the side cladding. (See operating manual
point 5.1 “Main switch”). Shortly after switching the system on the header screen will appear on the display of
the boiler control unit.
Reasons why alarms appear on the display:
• The control system is not completely adjusted
• Some parameter-assigned devices are not connected
• The connected devices are defective
Activate the “Set” button to delete the alarm shown in the display – however the alarm is still active!
(Alarm icon in the lower right corner of the display).
Use the “Esc” button or use the dial to display other alarms that may have occurred. You must acknowledge each
of these alarms in the manner described. (More detailed information is provided in section 7 “Troubleshooting” in
the operating manual)
3.2
Setting the parameters
Information on operating the KWB Comfort control system is provided in point 5.2 “Menu-driven operation” of
the operating manual.
If the alarm, “00 The control system is not completely set” occurs when switching on the main switch, you must
set date and time in accordance with point 5.2.3.8 in the operating manual.
In the main menu select the item “Specialist Level” and enter the code “100”. Now you have access to the settings
for the specialist level.
Proceed chronologically through the following menu levels of section 4 “Operation, specialist” Make the desired
settings.
MA-Easyfire 10.2008_EN.indd 43
MA-Easyfire 10.2008_EN.indd 43
30.03.2009 13:30:06 Uhr
30.03.2009 13:30:06 Uhr
Содержание Easyfire
Страница 1: ...Biomass Heating Systems Pellet boilers KWB Easyfire 10 30kW Installation and Maintenance Manual...
Страница 45: ......
Страница 59: ......
Страница 63: ......
Страница 69: ......
Страница 77: ......
Страница 95: ......
Страница 107: ......
Страница 113: ......
Страница 143: ......
Страница 161: ......
Страница 181: ......
Страница 213: ......
Страница 218: ...Notes...
Страница 219: ...Notes...