© KWB – Kraft und Wärme aus Biomasse GmbH
IM Easyfire 10/2008
Page
3
Table of contents
Table of contents
Table of contents
1 INTRODUCTION
.................................................................................................................... 9
1.1 Safety
instructions
...................................................................................................................................9
1.2 Warranty
..................................................................................................................................................9
1.3 Structural
prerequisites
...........................................................................................................................9
1.3.1
Boiler room requirements ........................................................................................................................................ 9
1.3.2
General requirements for pellet storage rooms ...................................................................................................... 10
1.3.3 Chimney
requirements
........................................................................................................................................... 10
2 SYSTEM
INSTALLATION
..................................................................................................... 13
2.1
Installation of the boiler .........................................................................................................................13
2.1.1
Bringing in the boiler .............................................................................................................................................. 13
2.1.1.1
Dismantling the system ......................................................................................................................................... 13
2.1.1.2
Bringing the dismantled system into the boiler room ............................................................................................. 19
2.1.2
Left / right system conversion ................................................................................................................................ 20
2.1.3
Changing the stop side of the boiler room door...................................................................................................... 22
2.1.4 Boiler
set-Up
.......................................................................................................................................................... 22
2.1.5
Automatic ash removal (AR) .................................................................................................................................. 23
2.1.6 Final
inspection
...................................................................................................................................................... 26
2.1.7
First commissioning, ash removal ......................................................................................................................... 26
2.1.8
Emptying the ash container ................................................................................................................................... 26
2.1.8.1
Removing the ash container .................................................................................................................................. 26
2.1.9
Smoke pipe connection and induced draft fan ....................................................................................................... 27
2.1.10 Water
connection
.................................................................................................................................................. 27
2.1.11 Electrical
connection
.............................................................................................................................................. 28
2.1.11.1
Electrical connections of the system ..................................................................................................................... 28
2.1.11.2 Mains
supply
......................................................................................................................................................... 31
2.1.11.3 Junction
box
.......................................................................................................................................................... 31
2.1.11.4 Cabling
guidelines
.................................................................................................................................................. 33
2.1.11.5
Control units & heating circuit expansion modules (HCM) ..................................................................................... 35
2.1.11.5.1
Boiler control unit / digital room control unit (OPTION) ......................................................................................... 35
2.1.11.5.2
Analogue room control unit (OPTION) ................................................................................................................... 36
2.1.11.5.3
Heating circuit expansion module (HCM): ............................................................................................................ 37
2.1.11.6
Plug-in module 1 (suction conveyor system, second boiler, heating circuit 0) ....................................................... 40
2.1.11.6.1
Suction conveyor system and / or second boiler switchover ................................................................................ 40
2.1.11.6.2
Heating circuit 0 and/or second boiler switchover ............................................................................................... 40
2.1.11.7
Boiler master-and-slave circuit .............................................................................................................................. 40
2.1.11.8
External smoke extractor ....................................................................................................................................... 40
2.1.11.9 Stop
switch
........................................................................................................................................................... 40
2.1.11.10 Equipotential
bonding
............................................................................................................................................ 41
2.1.11.11 Sensor
check
......................................................................................................................................................... 41
2.2
Installation, suction conveyor unit (see also section 13 to 16) ...............................................................42
3 COMMISSIONING
............................................................................................................... 43
3.1
Switching on the main switch ...............................................................................................................43
3.2
Setting the parameters ..........................................................................................................................43
3.3
Function check of the system parts .......................................................................................................44
3.4
Switching on the boiler in the menu ......................................................................................................45
4 OPERATION
SPECIALIST
.................................................................................................... 47
4.1
Menu item – Heating Circuits ................................................................................................................47
4.1.1 Operating
values
.................................................................................................................................................... 47
4.1.2
Dependant on outdoor temperature ....................................................................................................................... 49
4.1.3 Legionella
protection
.............................................................................................................................................. 49
4.2
Menu item – Basic Settings ..................................................................................................................50
4.2.1 Boiler
temperature
................................................................................................................................................. 50
4.2.2
Return flow boost .................................................................................................................................................. 50
4.2.3
Mixer return flow boost ......................................................................................................................................... 51
4.2.4
Pellet conveyor system .......................................................................................................................................... 51
MA-Easyfire 10.2008_EN.indd 3
MA-Easyfire 10.2008_EN.indd 3
30.03.2009 13:29:42 Uhr
30.03.2009 13:29:42 Uhr
Содержание Easyfire
Страница 1: ...Biomass Heating Systems Pellet boilers KWB Easyfire 10 30kW Installation and Maintenance Manual...
Страница 45: ......
Страница 59: ......
Страница 63: ......
Страница 69: ......
Страница 77: ......
Страница 95: ......
Страница 107: ......
Страница 113: ......
Страница 143: ......
Страница 161: ......
Страница 181: ......
Страница 213: ......
Страница 218: ...Notes...
Страница 219: ...Notes...