Page
18
IM Easyfire 10/2008
© KWB – Kraft und Wärme aus Biomasse GmbH
2 System installation
2 System installation
Detach the cable ties on the rear wall.
Detach cable ties
Unscrew the connectors from the rear wall.
Unscrew connectors
10.) Take off the cladding cover
Unscrew the screws of the hinge.
Unscrew the hinge
Unscrew the hinge from the cover.
Take off the cover.
Unscrew the cover hinge
11.) Dismount the junction box
Loosen the 4 fixing screws and unhook the junction box from the front.
Unhook the junction box
MA-Easyfire 10.2008_EN.indd 18
MA-Easyfire 10.2008_EN.indd 18
30.03.2009 13:29:51 Uhr
30.03.2009 13:29:51 Uhr
Содержание Easyfire
Страница 1: ...Biomass Heating Systems Pellet boilers KWB Easyfire 10 30kW Installation and Maintenance Manual...
Страница 45: ......
Страница 59: ......
Страница 63: ......
Страница 69: ......
Страница 77: ......
Страница 95: ......
Страница 107: ......
Страница 113: ......
Страница 143: ......
Страница 161: ......
Страница 181: ......
Страница 213: ......
Страница 218: ...Notes...
Страница 219: ...Notes...