6 Commissioning/Start-up/Shutdown
43 of 74
HPK-L
1136.8/15-EN
6.4 Returning to service
For returning the equipment to service observe the sections on commissioning/start-
up and the operating limits. (
In addition, carry out all servicing/maintenance operations before returning the
pump (set) to service. (
WARNING
Failure to re-install or re-activate protective devices
Risk of injury from moving parts or escaping fluid!
▷
As soon as the work is completed, properly re-install and re-activate any safety-
relevant devices and protective devices.
NOTE
If the equipment has been out of service for more than one year, replace all
elastomer seals.