7 Servicing/Maintenance
48 of 74
HPK-L
1136.8/15-EN
7.2.2.3 Cleaning filters
CAUTION
Insufficient inlet pressure due to clogged filter in the suction line
Damage to the pump!
▷
Monitor contamination of filter with suitable means (e.g. differential pressure
gauge).
▷
Clean filter at appropriate intervals.
7.2.3 Lubrication and lubricant change of rolling element bearings
7.2.3.1 Grease lubrication
The bearings are supplied packed with high-quality lithium-soap grease.
7.2.3.1.1 Grease quality
We recommend using Petro-Canada Peerless LLG high-temperature grease or an
equivalent product for lubrication. Under unfavourable operating conditions, e.g.
high room temperature, high atmospheric humidity, dust-laden air, aggressive
atmosphere etc., check the bearings earlier. If required, clean and re-lubricate them,
preferably with Petro-Canada Peerless LLG.
Klüber Asonic HQ72-102 can be used as an alternative.
CAUTION
Mixing greases of differing soap bases
Changed lubricating qualities!
▷
Thoroughly clean the bearings.
▷
Adjust the re-lubrication intervals to the grease used.
7.2.3.1.2 Grease quantities
Bearing bracket
Bearings
Grease qty. per single
bearing
LP02
7307 BG
6.5 to 8 g
LP03
7307 BG
6.5 to 8 g
LP04
7309 BG
13 to 15.5 g
LP05
7313 BG
23 to 26 g
LP06
7315 BG
29 to 33 g
The grease quantity indicated must be used for each single bearing of a bearing pair.
7.2.3.1.3 Intervals
▪
Under suitable operating conditions the grease-lubricated bearings will run for
25,000 operating hours.
▪
Under unfavourable operating conditions (e.g. high room temperature, high
atmospheric humidity, dust-laden air, aggressive industrial atmosphere) check
the bearings earlier and clean and re-lubricate them, if required.
▪
Replace the rolling element bearings after 25,000 operating hours or 3 years of
continuous operation.
Содержание HPK-L
Страница 1: ...Thermal Oil Hot Water Pump HPK L Installation Operating Manual ...
Страница 72: ......
Страница 73: ......