Operation
9
Securing/releasing knotter shaft
9.5
BiG Pack 1290 HDP XC
Original Operating Instructions 150000752_01_en
101
9.5
Securing/releasing knotter shaft
I
2
1
I
II
II
2
BP000-107
ü
The machine is shut down and safeguarded,
.
Securing
In order to secure the knotter shaft, move the brake lever (2) from position (I) to position (II)
and lay it down on the journal (1).
Releasing
In order to release the knotter shaft, move the brake lever (2) from position (II) to position (I).
9.6
Connecting twine rolls with each other (double knotter)
The procedure of connecting the twine rolls with each other is identical for the left and right
machine side. Therefore, the procedure described below for connecting the twine rolls applies
to both machine sides.
ü
The machine is shut down and safeguarded,
.
ü
.
Connecting upper twines (1)
BPG000-026
Make sure that the upper twines never cross over each other.
Содержание Big Pack 1290 HDP
Страница 345: ...II T P LS I III IV T P S1 S2 M1 M2 V1 V2 P1 B1 A1 B2 B1 T1 T T4 P 180 bar B36 100 bar B11 B35 150101911_00 2 4 ...
Страница 347: ...B17 K9 K11 K12 B B1 A A1 1 2 3 K13 3 4 5 1 2 150101911_00 3 4 ...
Страница 349: ...B17 K11 1 2 150101911_00 4 4 ...
Страница 351: ... LUFXLW GLDJUDP GRFXPHQW QR YHUVLRQ ODUJH VTX XDUH EDOHU L 3 LJK 6SHHG XW 9DUL XW 3 3 1 0HGLXP RPIRUW IURP PDFKLQH QR ...