Maintenance
312
Pos: 162.27 /BA/Wartung/Ladewagen/Kratzbodenkette kürzen @ 0\mod_1200034449903_78.docx @ 38848 @ 3 @ 1
17.6.1
Shortening of the floor conveyor chain
KDW05060
3
2
1
Figure 193
•
Remove the cotter pin (1) on the chain connecting link (3)
•
Remove the locking piece (2).
•
Shorten the chain by 2 or 4 links.
•
Connect the chain with the chain connecting link (3).
•
Secure the locking piece (2) and cotter pin (1).
Note
Both chains of the floor conveyor must be shortened by the same length. On the dual floor
conveyor, the relevant chair pairs belonging together must be shortened.
•
Re-tension the tension spring (3) until the screw (5) can be pushed through again.
•
Remove the threaded spindle and screw from the bore (7).
Pos: 162.28 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
Содержание AX 250 D
Страница 330: ...Maintenance hydraulic system 330 18 6 Circuit Diagram of the Hydraulic System Comfort Electronics Fig 209 ...
Страница 332: ...Maintenance hydraulic system 332 18 7 Hydraulic circuit diagram cross conveyor medium electronic system Fig 210 ...
Страница 334: ...Maintenance hydraulic system 334 18 8 Hydraulic circuit diagram cross conveyor comfort electronic system Fig 211 ...
Страница 397: ......
Страница 398: ...01 2 3 4 5 6 7 6 8 1 95 76 1 6 7 9 0 1 2 3 4 5 20 0 6 2 5 78 1 2 3 4 5 20 0 6 2 5 2 9 6 6 A ...