Commissioning
75
3x M8
3x M8 x70
4
3x 8,4/17x1,6
5
6
6x
7
2
4x
4x M16
4x M16 x190
4x 17X30X3
4x M16
4x M16 x100
4x 17X30X3
4x M10x25
4x M10
4x 10,5x21x 2
8
4x M10x60
2x M10x25
6x M10
6x 11x34x3
AX000021
Figure 31
•
Install the right side sheet (6) and the left side sheet (8).
•
Push the tubing for the canvass (7) through the seam (2) of the rear canvass as well as
through the supports of the side sheets (6, 8) and secure with the linch pin.
•
Push the tubing for the canvass (7) through the seam of the canvass (2) as well as through
the support of the tubular bar and secure with the linch pin (4).
•
Mount the cable holder (4) and attach the synthetic ropes (in the GL design, the expander
traction of the synthetic ropes must be hooked to the cable holder on the rear).
Pos: 119.32 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
Содержание AX 250 D
Страница 330: ...Maintenance hydraulic system 330 18 6 Circuit Diagram of the Hydraulic System Comfort Electronics Fig 209 ...
Страница 332: ...Maintenance hydraulic system 332 18 7 Hydraulic circuit diagram cross conveyor medium electronic system Fig 210 ...
Страница 334: ...Maintenance hydraulic system 334 18 8 Hydraulic circuit diagram cross conveyor comfort electronic system Fig 211 ...
Страница 397: ......
Страница 398: ...01 2 3 4 5 6 7 6 8 1 95 76 1 6 7 9 0 1 2 3 4 5 20 0 6 2 5 78 1 2 3 4 5 20 0 6 2 5 2 9 6 6 A ...