5-48
CLUTCH
1. Remove the Cover back. (See “PCB MAIN” on page 5-34.)
2. Disconnect the junction connector [1].
3. Remove one screw [2], then remove the Plate FG regist [3].
4. Remove the harness from the clamp [4].
5. Remove the E-ring [5] and remove the CLUTCH PRTR (RES) [6].
6. Disconnect the junction connector [7].
7. Remove two screws [8], then remove the Frame drive B [9].
8. Remove the CLUTCH PRTR (PF) [10].
9. Disconnect the junction connector [11].
10. Remove the harness from the clamp [12].
11. Remove the SR [13] and remove the CLUTCH [14].
12. Remove the harness from two clamps [15].
13. Remove the Spring C exit FG [16].
14. Remove two screws [17], then remove the Frame drive C [18].
15. Disconnect two junction connectors [19] and remove two CLUTCHs [20].
[1]
[2]
[3]
[5]
[6]
[7]
[4]
[8]
[9]
[10]
[19]
[19]
[18]
[20]
[20]
[11]
[12]
[13]
[14]
[15]
[16]
[17]
[17]
Содержание bizhub 25e
Страница 1: ...bizhub 25e FIELD ENGINEERING MANUAL version 1 May 2013 DD1 91200 60 ...
Страница 2: ......
Страница 6: ...iv ...
Страница 48: ...1 42 ...
Страница 76: ...2 28 ...
Страница 153: ...3 77 First page of the report The resettable counter cleared date is printed with six figure of date month year ...
Страница 154: ...3 78 Second page of the report ...
Страница 155: ...3 79 Third page of the report ...
Страница 156: ...3 80 Fourth page of the report ...
Страница 200: ...3 124 ...
Страница 201: ...3 125 ...
Страница 254: ...5 4 5 2 1 URADF TRAY DOCUMENT 1 Pull and remove the TRAY DOCUMENT 2 from the Guide outer B up 1 ...
Страница 325: ...5 75 4 Install the ASSY SCRAPER 5 to the Drum unit 6 5 6 ...
Страница 353: ......