5-41
ROLLER REGISTER
1. Open the Cover jam access [1].
2. Remove the SR4 [2] and remove the Gear 16H 0.8 [3].
3. Remove the Bearing roller register [4] and the Spring C register [5].
4. Remove the SR5 [6] then remove the Bearing roller register [7] and the Spring C register [8].
5. Remove the ROLLER REGISTER [9].
6. Remove the Bearing D6 8 [10] and the SR5 [11].
>@ >@
>@
>@
>@
>@
>@
>@
>@
>@
>@
Содержание bizhub 25e
Страница 1: ...bizhub 25e FIELD ENGINEERING MANUAL version 1 May 2013 DD1 91200 60 ...
Страница 2: ......
Страница 6: ...iv ...
Страница 48: ...1 42 ...
Страница 76: ...2 28 ...
Страница 153: ...3 77 First page of the report The resettable counter cleared date is printed with six figure of date month year ...
Страница 154: ...3 78 Second page of the report ...
Страница 155: ...3 79 Third page of the report ...
Страница 156: ...3 80 Fourth page of the report ...
Страница 200: ...3 124 ...
Страница 201: ...3 125 ...
Страница 254: ...5 4 5 2 1 URADF TRAY DOCUMENT 1 Pull and remove the TRAY DOCUMENT 2 from the Guide outer B up 1 ...
Страница 325: ...5 75 4 Install the ASSY SCRAPER 5 to the Drum unit 6 5 6 ...
Страница 353: ......