5-9
PC210/240-ENG
28.3. ATTACHMENT MOUNTING /
DISMOUNTING PROCEDURE
DISMOUNTING PROCEDURE
1.
Curl the arm in then lower the boom to the
ground.
Set the attachment valves on the arm to
the stop position as shown.
2.
Place the attachment on the ground and
stop the engine.
3.
Operate levers and attachment pedals to
full stroke 2 to 3 times to release hydraulic
system pressure. Ensure oil temperature
is low.
4.
Remove the hoses on the attachment side. Install the blind plugs to
the two outlets
a
.
Install blind plugs to the attachment hoses to prevent entry of dirt
during dismounting and storage.
5.
Dismount the attachment by removing the retaining pins (2 pins).
Then, mount the bucket.
For the bucket mounting procedure, see 12.15 “ R E P L A C E M E N T
AND INVERSION OF BUCKET’’.
6.
After the bucket is mounted, check the hydraulic oil level.
28. MACHINES READY FOR ATTACHMENTS
Содержание PC210
Страница 2: ......
Страница 44: ...1 32 PC210 240 ENG MEMO ...
Страница 45: ...2 1 PC210 240 ENG OPERATION ...
Страница 146: ...2 102 PC210 240 ENG ...
Страница 147: ...3 1 PC210 240 ENG MAINTENANCE ...
Страница 167: ...3 21 PC210 240 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Страница 220: ...3 74 PC210 240 ENG ...
Страница 221: ...4 1 PC210 240 ENG SPECIFICATIONS ...
Страница 226: ...4 6 PC210 240 ENG 25 SPECIFICATIONS PC240NLC 6K The values given are the values for PC240NLC 6K ...
Страница 231: ...4 11 PC210 240 ENG 25 SPECIFICATIONS ...
Страница 232: ...4 12 PC210 240 ENG ...
Страница 233: ...5 1 PC210 240 ENG OPTIONS ATTACHMENTS ...
Страница 266: ...5 34 PC210 240 ENG 5 32 ...