2-56
PC210/240-ENG
7.
Turn fuel control dial
a
to the full speed (MAX) position and carry
out the operation is Step 6 for 3 -5 minutes.
8.
Repeat the following operation 3 - 5 times and operate slowly.
•
Boom operation
RAISE
vn
LOWER
•
Arm operation
IN
vn
OUT
•
Bucket operation
CURL
vn
DUMP
•
Swing operation
LEFT
vn
RIGHT
•
Travel (Lo) operation
FORWARD
vn
REVERSE
REMARK
If the above operation is not carried out, there may be a delay in
response when starting or stopping each actuator, so continue the op-
eration until it becomes normal.
9.
Use working mode switch
b
on the monitor panel to switch to the
working mode to be used.
12. OPERATION
H/O G/O F/O L/O B/O
Содержание PC210
Страница 2: ......
Страница 44: ...1 32 PC210 240 ENG MEMO ...
Страница 45: ...2 1 PC210 240 ENG OPERATION ...
Страница 146: ...2 102 PC210 240 ENG ...
Страница 147: ...3 1 PC210 240 ENG MAINTENANCE ...
Страница 167: ...3 21 PC210 240 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Страница 220: ...3 74 PC210 240 ENG ...
Страница 221: ...4 1 PC210 240 ENG SPECIFICATIONS ...
Страница 226: ...4 6 PC210 240 ENG 25 SPECIFICATIONS PC240NLC 6K The values given are the values for PC240NLC 6K ...
Страница 231: ...4 11 PC210 240 ENG 25 SPECIFICATIONS ...
Страница 232: ...4 12 PC210 240 ENG ...
Страница 233: ...5 1 PC210 240 ENG OPTIONS ATTACHMENTS ...
Страница 266: ...5 34 PC210 240 ENG 5 32 ...