3-23
PC210/240-ENG
SERVICE ITEM
PAGE
Lubricating
•
Boom foot pin (2 points)
3-47
•
Boom cylinder rod end (2 points)
3-47
•
Arm cylinder foot pin (1 point)
3-47
•
Boom-arm coupling pin (1 point)
3-48
•
Arm cylinder rod end (1 point)
3-48
•
Bucket cylinder foot pin (1 point)
3-48
•
Arm-link coupling pin (1 point)
3-48
•
Arm-bucket coupling pin (1 point)
3-48
•
Link coupling pin (2 point)
3-48
•
Bucket cylinder rod end (1 point)
3-48
•
Bucket-link coupling pin (2 points)
3-48
Check oil level in swing machinery case, add oil
3-48
Drain water and sediment from fuel tank
3-49
Clean fresh air intake heater filter
3-49
EVERY 250 HOURS SERVICE
Check oil level in final drive case, add oil
3-51
Check level of battery electrolyte
3-52
Lubricate swing circle (2 points)
3-53
Check air conditioner compressor belt tension, adjust
3-54
EVERY 500 HOURS SERVICE
Replace fuel cartridges
3-55
Check swing pinion grease level, add grease
3-57
Change oil in engine oil pan, replace engine oil filter cartridge
3-58
Clean and inspect radiator fins, oil cooler fins and condensor fins
3-59
(only for machines equipped with air-conditioner)
23. MAINTENANCE SCHEDULE CHART
Содержание PC210
Страница 2: ......
Страница 44: ...1 32 PC210 240 ENG MEMO ...
Страница 45: ...2 1 PC210 240 ENG OPERATION ...
Страница 146: ...2 102 PC210 240 ENG ...
Страница 147: ...3 1 PC210 240 ENG MAINTENANCE ...
Страница 167: ...3 21 PC210 240 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Страница 220: ...3 74 PC210 240 ENG ...
Страница 221: ...4 1 PC210 240 ENG SPECIFICATIONS ...
Страница 226: ...4 6 PC210 240 ENG 25 SPECIFICATIONS PC240NLC 6K The values given are the values for PC240NLC 6K ...
Страница 231: ...4 11 PC210 240 ENG 25 SPECIFICATIONS ...
Страница 232: ...4 12 PC210 240 ENG ...
Страница 233: ...5 1 PC210 240 ENG OPTIONS ATTACHMENTS ...
Страница 266: ...5 34 PC210 240 ENG 5 32 ...