5-26
PC210/240-ENG
Moving the chisel while carrying out impacting operations
Holding the chisel horizontal or pointed up when carrying out impacting
operations
Twisting the chisel when it has penetrated the rock
Pecking operations
Extending the bucket cylinder fully and thrusting to raise the machine off
the ground
30. EXTENDING MACHINE SERVICE LIFE
5-24
Содержание PC210
Страница 2: ......
Страница 44: ...1 32 PC210 240 ENG MEMO ...
Страница 45: ...2 1 PC210 240 ENG OPERATION ...
Страница 146: ...2 102 PC210 240 ENG ...
Страница 147: ...3 1 PC210 240 ENG MAINTENANCE ...
Страница 167: ...3 21 PC210 240 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Страница 220: ...3 74 PC210 240 ENG ...
Страница 221: ...4 1 PC210 240 ENG SPECIFICATIONS ...
Страница 226: ...4 6 PC210 240 ENG 25 SPECIFICATIONS PC240NLC 6K The values given are the values for PC240NLC 6K ...
Страница 231: ...4 11 PC210 240 ENG 25 SPECIFICATIONS ...
Страница 232: ...4 12 PC210 240 ENG ...
Страница 233: ...5 1 PC210 240 ENG OPTIONS ATTACHMENTS ...
Страница 266: ...5 34 PC210 240 ENG 5 32 ...