3-48
PC210/240-ENG
5.
Boom-Arm coupling pin (1 point)
6.
Arm cylinder rod end (1 point)
7.
Bucket cylinder foot pin (1 point)
8.
Arm-Link coupling pin (1 point)
9.
Arm-Bucket coupling pin (1 point)
10. Link coupling pin (2 points)
11. Bucket cylinder rod end (1 point)
12. Bucket-Link coupling pin (1 points)
24.4.2 CHECK OIL LEVEL IN SWING MACHINERY
CASE, ADD OIL
The oil is at high temperature immediately after the machine
has been operated. Wait for the oil to cool down before carry-
ing out this check.
1.
Remove dipstick
G
and wipe the oil from the dipstick with a cloth.
2.
Insert dipstick
G
fully in the guide.
3.
When dipstick
G
is pulled out, if the oil level is between the H and L
marks of the gauge, oil level is proper.
WARNING
24. SERVICE PROCEDURE
Содержание PC210
Страница 2: ......
Страница 44: ...1 32 PC210 240 ENG MEMO ...
Страница 45: ...2 1 PC210 240 ENG OPERATION ...
Страница 146: ...2 102 PC210 240 ENG ...
Страница 147: ...3 1 PC210 240 ENG MAINTENANCE ...
Страница 167: ...3 21 PC210 240 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Страница 220: ...3 74 PC210 240 ENG ...
Страница 221: ...4 1 PC210 240 ENG SPECIFICATIONS ...
Страница 226: ...4 6 PC210 240 ENG 25 SPECIFICATIONS PC240NLC 6K The values given are the values for PC240NLC 6K ...
Страница 231: ...4 11 PC210 240 ENG 25 SPECIFICATIONS ...
Страница 232: ...4 12 PC210 240 ENG ...
Страница 233: ...5 1 PC210 240 ENG OPTIONS ATTACHMENTS ...
Страница 266: ...5 34 PC210 240 ENG 5 32 ...