![Komatsu D65EXi-18 Скачать руководство пользователя страница 98](http://html1.mh-extra.com/html/komatsu/d65exi-18/d65exi-18_operation-and-maintenance-manual_1991131098.webp)
5.
On “Project Files” screen, press “Copy...”.
6.
On “Copy files” screen, select “D: to 3DMC folder”.
7.
Select a project file to be imported to the internal memory
of the control box, and press “Ok”.
The selected project file is imported into the internal mem-
ory of the control box.
8.
On “Project Files” screen, select the imported file, and
press “Ok”.
The imported project file is set as the current work in the
control box.
REMARK
If a project file is saved already in the internal memory of the control box, select the one to use.
METHOD FOR IMPORTING PROJECT FILES
When importing project files into the internal memory of the control box, perform the following procedure.
AJD02554
AJD02555
AJD02556
FILE MENU
HANDLE CONTROL BOX
4-8
Содержание D65EXi-18
Страница 2: ......
Страница 74: ...Turn the machine to the direction of spreading MACHINE OPERATIONS AND CONTROLS OPERATION 3 60...
Страница 91: ...HANDLE CONTROL BOX 4 1...
Страница 176: ......
Страница 177: ...SPECIFICATIONS 5 1...
Страница 180: ......
Страница 184: ...D65EXi 18 D65PXi 18 BULLDOZER Form No EENAM03390 2015 KOMATSU All Right Reserved Printed in Belgium 04 2015...