![Komatsu D65EXi-18 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/komatsu/d65exi-18/d65exi-18_operation-and-maintenance-manual_1991131037.webp)
2.
Press power supply ON switch (green) to turn on the con-
trol box power.
Starting switch of the machine can be turned off.
3.
On the control box screen, press “iB logo key” and display
the main menu.
4.
On “Tools” menu, press “Configure radios...” and select.
“GNSS Radio Setup” screen is displayed.
5.
Select each item matching with the specifications of GNSS
radio device and the radio setting of the base station, and
press “Ok”.
(Example of the setting)
6.
Set GNSS radio device according to the radio setting of the usable base station.
For the settings of GNSS radio device, see the instruction manual of the installed GNSS radio device.
7.
Check that mark "x" of “radio status” of “elevation control
key” goes out and the message of “Waiting for radio link...”
is not displayed.
The radio wave from the base station is received.
PROJECT FILE SETTING
Project file is necessary to use the blade automatic control function.
Project file contains the data necessary for the work with “intelligent Machine Control” such as the design sur-
face, base point, etc.
Project file is created on a personal computer by using 3D-Office software.
3D-Office which is provided by Topcon Co. Ltd., is the machine control supporting software for a personal com-
puter. For details, see the operation and maintenance manual for 3D-Office.
For setting of the project file, see “PROJECT FILES (4-7)”.
OPERATION
MACHINE OPERATIONS AND CONTROLS
3-23
Содержание D65EXi-18
Страница 2: ......
Страница 74: ...Turn the machine to the direction of spreading MACHINE OPERATIONS AND CONTROLS OPERATION 3 60...
Страница 91: ...HANDLE CONTROL BOX 4 1...
Страница 176: ......
Страница 177: ...SPECIFICATIONS 5 1...
Страница 180: ......
Страница 184: ...D65EXi 18 D65PXi 18 BULLDOZER Form No EENAM03390 2015 KOMATSU All Right Reserved Printed in Belgium 04 2015...