System Operating Procedures
October 2002
3-37
Entering the Flow Rate
1.
Measure the flow rate. See “Measuring the Flow Rate” above.
2. Press
Set
twice to enter the Calibrate mode.
3. Use
the
Up
or
Down Arrow
to enter the measured flow rate.
4. Record and save the calibration values so they can be reentered if the
memory is cleared.
5. Press
Set
once or press a different blue function key to return the screen to
View mode.
Managing the Development Time
IMPORTANT: To prevent paper jams or image artifacts, operate the processor
development time within the recommended RA
–
4 specification—
45 seconds.
Viewing the Development Time
Press
Drive
to access the Drive Motor screen.
NOTE: If the drive is running, the current development time appears on the bottom
line. It is displayed in minutes and seconds. If not, the screen shows a
development time of “zero-00:00.”
Setting the Development Time
1.
Select the Drive Motor screen.
2. Press
Set
to access the Drive screen in Set mode.
3. Use
the
Up
or
Down Arrow
to change the set development time.
4. Press
Set
three times or press a different blue function key to return the
screen to View mode.
NOTE:
Press
Drive
to toggle the drive motor between Manual on, Manual
off or Automatic mode.
Calibrating the Development Time
1.
Run a cleanout sheet through the processor and use a stopwatch to
determine the actual time taken from entering the developer tank to entering
the bleach tank. If necessary, calibrate the processor.
2. Select the Drive screen.
3. Press
Set
twice to access the drive screen in the Calibrate mode.
4. Use
the
Up
or
Down Arrow
to change the offset. As the offset changes, the
displayed development time changes. Increase and decrease the offset until
the displayed time matches the actual time. If necessary, choose an average
value for the offset.
5. Record and save the calibration value.
6. Press
Set
twice or press a different blue function key to return to View mode.
Содержание Professional RP 50
Страница 1: ...KODAK PROFESSIONAL RP 50 LED Printer Operator s Guide Part No 2J0686 ...
Страница 16: ......
Страница 74: ......
Страница 90: ......
Страница 118: ......
Страница 122: ......
Страница 146: ...Additional Calibration Information C 12 October 2002 Value Graph ...
Страница 147: ...Additional Calibration Information October 2002 C 13 Difference Graph ...
Страница 168: ......
Страница 190: ......
Страница 197: ......