
11
3.5. Installation KMT-1, KMT-2 and KMT-3
3.5.1. Measurement ball valve
•
all connections to be made with appropriated sealing material on the threads.
•
the sealing material should not change the area of the inner cross section of the pipe. It must be
warranted that the connections after installation are free of leaks.
•
All fittings must be tested on seal tightness.
•
Observe the required length of inlet and outlet pipe section.
•
The recess for the alignment pin must be at the side of the outlet.
recess for
alignment pin
Flow
Direction
3.5.2. Assembly without flow meter, but with screw cap instead (blind cap)
In order to use the measurement section without the flow meter, the blind screw cap (in
the scope of supply) must be screwed tight onto the opening of the measurement ball
valve. If not needed the screw cap can be screwed and stored on the handle of the meas-
urement valve with shut-off function.
3.5.3. Shut off the measurement ball valve
The measurement ball valve allows for the installation and removal of the flow meter within seconds, with only
a very short interruption of the flow.
OPEN
CLOSED
Never remove the flow meter
or the blind screw cap while
the measurement ball valve is
open.
That is extremely dangerous!
Содержание KMT-1
Страница 36: ...www kobold com...