![Kobold Heinrichs Coriolis Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/kobold/heinrichs-coriolis/heinrichs-coriolis_operating-manual_1982428018.webp)
Page 18 of 105
OPERATING MANUAL HPC & UMC4
4.4.2 Installation positions
The HPC may be installed and will be fully functional in any number of positions. The following images
demonstrate the most common means of pipe installation as well as delivering tips for preventing the
orientation of the mounted device from influencing the measurement.
4.4.2.1
Assessment of the installation position
Standard Installation position A
Installation position B
Installation position C
Installation position D
Type of fluid
Position
Assessment
Pure liquids
Standard Position A
Self-draining flow tubes, recommended position
Position B
OK
Position C
OK
Position D
Liquid residue remains in pipe
Liquids with gas bub-
bles
Standard Position A
Self-draining flow tubes, gas bubbles will not accumulate
in the tubes
Position B
Not recommended owing to gas bubble accumulation in
the tubes
Position C
Gas bubbles may accumulate in the presence of low flow
velocities