27
4
Quadrant
Energy Analyzer
4
Quadrant
Energy Analyzer
3.1.7 Start
When Start tab is selected, press OK key to initialize Klea.
Initializing ..........................
Startup Settings
Language English
Date
07 January 2013
Time 17:45:28
CTR
1
VTR
1.0
Connection
3phase 4wire
Start
Fig. 3-9 Start
KLEA “first power-on” settings page only appears when KLEA is powered up for the
first time after factory production. Following this first initialization, all the required
settings (including “first power-on” page settings) can be accomplished via Settings
menu of KLEA.
3.2 Startup Screen
After KLEA is turned on, following page appears.
V1
V2
V3
V
V
V
A
A
A
I
1
I
2
I
3
1 7 : 2 2
220.0
220.0
220.0
5.0
5.0
5.0
V
1 2 3
I
1
2
1
2
E
Settings
Measure Meters
Alarms Analysis
Fig. 3-10 Startup Screen
SECTION 3 MENUS
Содержание Klea 320P-D
Страница 1: ...1 4Quadrant Energy Analyzer 1 KLEA Network Analyzer User Manual 4Quadrant Energy Analyzer...
Страница 8: ...8 4Quadrant Energy Analyzer SECTION 1 GENERAL INFORMATION 4Quadrant Energy Analyzer...
Страница 14: ...14 4Quadrant Energy Analyzer SECTION 2 INSTALLATION 4Quadrant Energy Analyzer...
Страница 21: ...21 4Quadrant Energy Analyzer SECTION 3 MENUS 4Quadrant Energy Analyzer...
Страница 82: ...82 4Quadrant Energy Analyzer SECTION 4 MODBUS PROTOCOL 4Quadrant Energy Analyzer...
Страница 119: ...119 4Quadrant Energy Analyzer SECTION 5 FACTORY DEFAULT SETTINGS 4Quadrant Energy Analyzer...
Страница 123: ...123 4Quadrant Energy Analyzer SECTION 6 TECHNICAL SPECIFICATIONS 4Quadrant Energy Analyzer...