17
4
Quadrant
Energy Analyzer
4
Quadrant
Energy Analyzer
KLEA is connected to current transformer(s). Before disconnecting
current transformer leads, be sure that they are short circuited elsewhere
or connected to a parallel load which has sufficie tly low impedance.
Otherwise dangerously high voltages will be induced at the current
transformer leads. Same phenomena also apply for putting into service.
The cable is placed into the related opening.
Fig. 2-4 Inserting Cable into the Terminal Block
After the cable is placed, the screws are tightened and the cable is fixed.
Fig. 2-5 Fixing the Cable to the Terminal Block
The Terminal Block is inserted into its seat located on KLEA.
SECTION 2 INSTALLATION
Содержание Klea 320P-D
Страница 1: ...1 4Quadrant Energy Analyzer 1 KLEA Network Analyzer User Manual 4Quadrant Energy Analyzer...
Страница 8: ...8 4Quadrant Energy Analyzer SECTION 1 GENERAL INFORMATION 4Quadrant Energy Analyzer...
Страница 14: ...14 4Quadrant Energy Analyzer SECTION 2 INSTALLATION 4Quadrant Energy Analyzer...
Страница 21: ...21 4Quadrant Energy Analyzer SECTION 3 MENUS 4Quadrant Energy Analyzer...
Страница 82: ...82 4Quadrant Energy Analyzer SECTION 4 MODBUS PROTOCOL 4Quadrant Energy Analyzer...
Страница 119: ...119 4Quadrant Energy Analyzer SECTION 5 FACTORY DEFAULT SETTINGS 4Quadrant Energy Analyzer...
Страница 123: ...123 4Quadrant Energy Analyzer SECTION 6 TECHNICAL SPECIFICATIONS 4Quadrant Energy Analyzer...