45
16. Warranty.
1.
The manufacturer, BTI GUMKOWSKI Sp. z o.o. Sp. k., provides a 36-month guarantee
for the smooth operation of the ROT-POWER Burner to the extent described in this Ser-
vice Manual, starting from the date of the Burner installation (with the exception of point
2), provided that the annual payable inspection of the burner is carried out by an author-
ized installer of the burner. Otherwise, the guarantee is valid for 12 months.
2.
The igniter warranty lasts for a period of 2 years or 800 ignitions.
3.
Defects found during the warranty period shall be removed within 21 working days from
the date of filing the complaint.
4.
Any defect disclosed during operation must be reported promptly.
5.
Documents required to perform free repairs are: completed Installation Protocol and
proof of purchase of the burner.
6.
Warranty Card is not valid in the case of absence of the required stamps, signatures and
dates.
7.
Completed installation protocol should be sent to the manufacturer within 14 days from
the date of installation of the burner in paper or electronic form.
8.
The first run of the burner and setting the operating parameters is the one carried out by
an authorized service technician.
9.
Warranty will not apply in the case of:
installation, operation or use of the burner conducted not in accordance with this Ser-
vice Manual,
any changes or burner modifications,
starting the burner without its installation in the boiler,
too small cross section of the chimney or to narrow chimney draft,
repairs by persons not authorized by the Manufacturer,
malfunction of the electrical system,
incorrect parameter setting of the burner,
combustions of fuels not included in the Manufacturer's specifications,
the impossibility to access the installed burner.
10.
Warranty does not cover:
adjustment of the burner parameters,
cleaning and maintenance.
11.
Costs of service calls for repairs related to paragraphs 9 and 10 shall be covered by the
customer.
12.
Complaints should be reported: by mail, electronically or by fax.
Содержание ROT-POWER 10-50 kW
Страница 5: ...5 Fig 1 Block diagram of the burner ...
Страница 9: ...9 Fig 2 Components of the set ...
Страница 22: ...22 Fig 8 Cleaning the tubular blower chamber view 1 ...
Страница 23: ...23 Fig 9 Cleaning the tubular blower chamber view 2 ...
Страница 27: ...27 Fig 11 Lubricating the bearings of the combustion chamber view 1 ...
Страница 28: ...28 Fig 12 Lubricating the bearings of the combustion chamber view 2 ...
Страница 30: ...30 Fig 13 Igniter Replacement ...
Страница 34: ...34 12 2 Electric diagram of the burner Fig 15 Wiring diagram of the burner where ...