21
19.
Mount the plate with drives (8), during this step placed the igniter (12) in its slot, pushing
it firmly to the screen plate. The undercut (10) in the drive shaft must match the undercut
in the shaft of the drive motor - you may rotate the drive shaft by turning the tube (1) in
"Z" direction. The temperature sensor (13) should match the slot in the tee connector of
the fuel supply. Tighten screws (7).
20.
Replace the housing (9).
21.
Tighten screws (6).
22.
Close the boiler door.
23.
Connect cables disconnected in par. 1.
24.
The burner is ready for operation.
Содержание ROT-POWER 10-50 kW
Страница 5: ...5 Fig 1 Block diagram of the burner ...
Страница 9: ...9 Fig 2 Components of the set ...
Страница 22: ...22 Fig 8 Cleaning the tubular blower chamber view 1 ...
Страница 23: ...23 Fig 9 Cleaning the tubular blower chamber view 2 ...
Страница 27: ...27 Fig 11 Lubricating the bearings of the combustion chamber view 1 ...
Страница 28: ...28 Fig 12 Lubricating the bearings of the combustion chamber view 2 ...
Страница 30: ...30 Fig 13 Igniter Replacement ...
Страница 34: ...34 12 2 Electric diagram of the burner Fig 15 Wiring diagram of the burner where ...