
10
5.
Assembling the Unit.
Usually, the ROT-POWER burner is connected to the already working installation of the
boiler. Depending on the design of the boiler, the connection is mounted to the furnace door.
The burner must be placed in a location that allows easy access to the burner and enables in-
stallation to the boiler door. This solution provides easy cleaning and a possible review of the
hearth. In the event of too small width of the door, the burner shall be mounted asymmetrical-
ly - closer to the hinges. When this operation is insufficient - us a spacer plate or insulating
jacket with the mounting plate, to provide a distance with adjusting step. Exact mounting
dimensions are specified in section 5.1.
Depending on the type of door closing (sealing) design - take measurements to analyse
whether opening of the door would interfere with the burner.
It is also possible to mount the burner to the custom door/side of the furnace – but
when it is needed - consult it with a service technician and the manufacturer.
The burner must connected to the pellet tray, which may be purchased from the manu-
facturer of the burner or you may use another tray made of non-combustible material, which
enables you to connect to the auger feeder (ø60 pipe) - observe the installation instructions in
sec. 11-14. Pay particular attention to the bottom of the feeder where the feed screw/auger is
present - it must be fully covered by the fuel and protected against hand contact during the
operation. The rotating auger may cause injuries.
Burner installation should be performed by the service technician authorized by the
manufacturer. Installation work should be completed with an installation and commission
protocol.
5.1. Assembly Instructions.
1.
Take the measurement of boiler door dimensions and determine the optimal point of
attachment of the burner.
2.
The burner must be placed in the central heating boiler or in other heat exchanger,
maintaining dimensions shown in the following diagram and table. Make a hole for
the outer tube of the burner and mounting holes for attaching burner to the boiler door.
3.
Perform the mounting holes in the door according to specifications for particular burn-
er.
4.
If required, use the spacer plate or the insulating jacket.
Содержание ROT-POWER 10-50 kW
Страница 5: ...5 Fig 1 Block diagram of the burner ...
Страница 9: ...9 Fig 2 Components of the set ...
Страница 22: ...22 Fig 8 Cleaning the tubular blower chamber view 1 ...
Страница 23: ...23 Fig 9 Cleaning the tubular blower chamber view 2 ...
Страница 27: ...27 Fig 11 Lubricating the bearings of the combustion chamber view 1 ...
Страница 28: ...28 Fig 12 Lubricating the bearings of the combustion chamber view 2 ...
Страница 30: ...30 Fig 13 Igniter Replacement ...
Страница 34: ...34 12 2 Electric diagram of the burner Fig 15 Wiring diagram of the burner where ...