MQRSP5 for MQZDV3318/3622
Step 6:
Place rocks #6 into place as shown.
Do not place
directly over the multiple porting areas.
Step 7:
Place rocks #4 into position as shown. Place the
highlighted rocks into position being sure that they are crossing
over the single line porting.
MQRSP5 finished setup and burn.
Step 8:
Place rock #3 and rock #1 into position as shown to
complete the setup. Lava rock and vermiculite are optional for
placement around the rock platform on the burner pan.
Note: If flame impingement on the rocks causes sooting,
you may have to move or remove one or more rocks. Do
not place rocks directly over top of the burner tube.
26
Содержание Marquis MQZDV3318
Страница 35: ...Gas Conversion for Modulator PART C 35...
Страница 39: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 39...
Страница 47: ...Proflame 2 Remote Control 47...