Silent Walk Test.
Run a Silent Walk Test.
Purpose
: To suspend normal system operation for functional testing of one or more SmartOne
initiating devices.
The ARIES NET
Link
control unit will operate identically as in standard Walk Test mode when in a
silent Walk Test mode, except that it will not energize the outputs programmed for walk-test
activation.
4
Stop Walk Test.
End Walk Test.
Purpose:
To terminate a walk test.
Note:
The walk-test mode will automatically end after 30 minutes of inactivity. It can also be
stopped by a system reset.
5
Alarm Sim Test.
Run an Alarm-Simulation Test.
Purpose
:
Purpose
: To activate system outputs by simulating an initiating-device event during system testing.
The initiating device is not activated. The ARIES NET
Link
system outputs are activated as if the
simulated initiating device had actually reported an alarm condition.
The simulated alarm report causes execution of the control unit's application program and activates
any outputs in the general-alarm list. Event acknowledgment, alarms silencing, and a system reset
are required to return the system to normal operating condition.
Note:
The simulated alarm report must be manually de-activated via a menu operation before the
system can be reset and returned to normal operating condition.
The alarm-simulation test can be run concurrently for multiple devices to test counting and crossed-zoned
applications. Subsequent alarm acknowledgment and silencing are required. Each simulated initiating
device must be manually de-activated via the menu before the control unit can be reset.
5
Alarm Sim Test.
De-Activate an Alarm-Simulation Test.
Purpose
: To report an "alarm-off" message from an initiating device whose activation was simulated.
Note:
Each simulated alarm report must be manually de-activated via this menu operation
before the system can be returned to normal operating condition.
CAUTION
Physically disconnect the wiring to all agent-release and pre-action-sprinkler circuits
before walk testing any SLC initiating devices. Restore the system to normal operating
condition at the conclusion of these tests and any other functional tests that were
performed.
CAUTION
Isolate all releasing outputs using the Isolate function and physically disconnect the wiring to
all agent-release, pre-action-sprinkler and auxiliary control circuits before running any alarm-
simulation test(s). Restore the system to normal operating condition at the conclusion of these
tests and any other functional tests that were performed.
CAUTION
Isolate all releasing outputs using the Isolate function and physically disconnect the wiring to
all agent-release and pre-action-sprinkler circuits and auxiliary control circuits before running
any alarm-simulation test(s). Restore the system to normal operating condition at the
conclusion of all simulated alarm tests and any other functional tests that were performed.
Содержание ARIES NETLink
Страница 2: ......
Страница 14: ...Table of Contents February 2012 xii P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 20: ...List of Tables February 2012 xviii P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 78: ...Installation February 2012 2 22 P N 06 237058 001 Figure 2 17 Installing the Expansion Card Cage ...
Страница 112: ...Installation February 2012 2 56 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 166: ...Configuration and Programming February 2012 3 54 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 194: ...Operation February 2012 4 28 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 203: ...Networking P N 06 237058 001 5 9 February 2012 Figure 5 5 Processing Group 0 Networked Control Unit Interactions ...
Страница 222: ...Testing and Maintenance February 2012 6 4 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 250: ...Troubleshooting February 2012 7 28 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 268: ...List of Agency Listed Compatible Devices February 2012 C 4 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 270: ...FM Rules for Preaction Deluge Systems February 2012 D 2 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 286: ...ARIES NETLINK For City Of Chicago Applications February 2012 G 6 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 293: ......