MEASURING CLASS-A SLC WIRING RESISTANCE
Note:
The following resistance reading MUST be taken PRIOR to the installation of any loop device.
The total wiring resistance from the start of the “Out” leg to the end of the “Return” leg cannot exceed
40 ohms. Use the following procedure to determine the wiring resistance.
1. Short the “Out” and “Return” legs as shown in Figure 2-27. Measure the resistance using the
other two terminating points at the control unit
2. Remove the shorting jumper after the resistance measurement.
Figure 2-27. Measuring CLASS-A SLC Wiring Resistance
2-8.5.6
MEASURING CLASS-A SLC WIRING CAPACITANCE
The total wiring capacitance cannot exceed 0.5
F. Use the following procedure to determine the
wiring capacitance.
Note:
The following capacitance reading MUST be taken PRIOR to the installation of any loop
device.
1. Measure the capacitance using the wiring that will connect to control unit terminals J19-1 and
J19-3 (Terminals J19-2 and J19-4 MUST remain disconnected from the control unit) as shown
in Figure 2-28.
Figure 2-28. Measuring CLASS-A SLC Wiring Capacitance
2-8.5.7
MEASURING CLASS-A, STYLE 7 SLC WIRING RESISTANCE AND CAPACITANCE
Contact your authorized Kidde distributor for the best method of ensuring proper total resistance
and capacitance for CLASS-A, Style 7 SLC loop wiring.
Jumper
Out Leg
Return Leg
Volt-Ohm Meter
Out Leg
Return Leg
Capacitance Meter
Содержание ARIES NETLink
Страница 2: ......
Страница 14: ...Table of Contents February 2012 xii P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 20: ...List of Tables February 2012 xviii P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 78: ...Installation February 2012 2 22 P N 06 237058 001 Figure 2 17 Installing the Expansion Card Cage ...
Страница 112: ...Installation February 2012 2 56 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 166: ...Configuration and Programming February 2012 3 54 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 194: ...Operation February 2012 4 28 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 203: ...Networking P N 06 237058 001 5 9 February 2012 Figure 5 5 Processing Group 0 Networked Control Unit Interactions ...
Страница 222: ...Testing and Maintenance February 2012 6 4 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 250: ...Troubleshooting February 2012 7 28 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 268: ...List of Agency Listed Compatible Devices February 2012 C 4 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 270: ...FM Rules for Preaction Deluge Systems February 2012 D 2 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 286: ...ARIES NETLINK For City Of Chicago Applications February 2012 G 6 P N 06 237058 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 293: ......