12
Unite
®
Panel System - Worksurface Installation
Assembly Instructions
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
#12 x /
3
4
”
screws
#12 x /
3
4
”
screws
Corner Change-of-Height
Brackets (cont.)
5. Turn the upper worksurface to
the upright position and set into
place on the lower worksurface
and cantilever bracket, carefully
guiding the installed L-bracket
between the edge of the lower
worksurface and the Unite panel.
Press in on the panel to allow the
L-bracket to pass through, taking
care to not damage the panel
material or the lower worksurface
(Figure 15).
6. At the non change-of-height end,
align the pre-drilled mounting
holes in the worksurface
underside with the holes in the
cantilever bracket and secure with
two #12 x
3
/
4
” screws to secure
Take care to not over-tighten the
screws (Figure 15).
7. Working under the lower
worksurface at the
change-of-height end, engage
the tang of the lock bracket into
the slot of the L-bracket that
protrudes below the worksurface
underside. Gently push in on the
tile material to give the tang of
the lock bracket room to rotate up
to be flush with the worksurface
underside. Carefully drill two
1
/
8
” diameter pilot holes to no
more than
1
/
2
” deep through
the center of the lock bracket’s
mounting holes. Take care to not
drill too deep to avoid damage
to the worksurface. Secure the
lock bracket using two #12 x
3
/
4
”
screws (Detail C).