6 Installation Note N5242-90120
Getting Prepared
-
Getting Prepared
To successfully install this upgrade kit, you will need the following:
— A license key - refer to
below.
— A PDF copy or a paper copy of the PNA Service Guide - refer to
“Downloading the Online PNA Service Guide”
below.
— An ESD-safe work area - refer to
“Protecting Your Workspace from
below.
“Tools Required for the Installation” on page 8
.
— Enough time - refer to
“About Installing the Upgrade” on page 8
.
— Test equipment for the post-upgrade adjustments and full instrument
calibration. To view the equipment list, click the Chapter 3 bookmark “Tests
and Adjustments” in the PDF Service Guide
1
.
License Key Redemption
To enable the option product(s), you must request license key(s) file from the
http://www.keysight.com/find/softwaremanager
To complete the request, you will need to gather the following information:
— From the certificate
— Order number
— Certificate number
— From your instrument
The PNA contains extremely sensitive components that can be ruined if
mishandled. Follow instructions carefully when making cable connections,
especially wire harness connections.
The person performing the work accepts responsibility for the full cost of
the repair or replacement of damaged components.
1. See
“Downloading the Online PNA Service Guide” on page 7
.
If you are unfamiliar with the licensing process, refer to the
http://literature.cdn.keysight.com/litweb/pdf/N5242-90024.pdf
.
The enclosed Software Entitlement Certificate is a receipt, verifying that
you have purchased a licensed option for the PNA of your choice. You must
now use a Keysight Web page to request a license key file for the
instrument that will receive the option.
Содержание PNA-X N5241B
Страница 20: ...20 Installation Note N5242 90120 All Instruments Figure 4 Existing Attenuators and Brackets Removal ...
Страница 22: ...22 Installation Note N5242 90120 All Instruments Figure 5 Attenuators and Bypass Switches Assembly ...
Страница 27: ...Installation Note N5242 90120 27 All Instruments Figure 8 A22 Splitter Installation ...
Страница 30: ...30 Installation Note N5242 90120 All Instruments Figure 9 Noise Receiver Board Installation ...
Страница 35: ...Installation Note N5242 90120 35 All Instruments Figure 11 New Test Set Cable Installation Part 2 ...
Страница 37: ...Installation Note N5242 90120 37 All Instruments Figure 12 Power Supply Replacement ...
Страница 39: ...Installation Note N5242 90120 39 All Instruments Figure 13 Lower Front panel Overlay Replacement ...
Страница 48: ...48 Installation Note N5242 90120 All Instruments ...
Страница 49: ...Installation Note Xxxxx xxxxx 3 ...