8 Installation Note N5242-90120
Getting Prepared
-
Tools Required for the Installation
About Installing the Upgrade
Description
Qty
Part Number
T-10 TORX driver (set to 9 in-lbs)
1
N/A
T-20 TORX driver (set to 21 in-lbs)
1
N/A
5/16-in torque wrench (set to 10 in-lbs)
1
N/A
5/16-in torque wrench (set to 21 in-lbs)
1
N/A
1-in torque wrench (set to 72 in-lbs)
1
N/A
Use a 5/16-in torque wrench set to 10 in-lbs on all cable connections
except the front and rear panel bulkhead connectors. Torque these
connections to 21 in-lb.
Products affected
N5242B, N5242B, and N5249B Options 217, 219, 222, or 224
Installation to be performed by
Keysight service center or personnel qualified by Keysight
Estimated installation time
5 hours
Estimated adjustment time
1.0 hours
Estimated full instrument calibration time 6.0 hours
Содержание PNA-X N5241B
Страница 20: ...20 Installation Note N5242 90120 All Instruments Figure 4 Existing Attenuators and Brackets Removal ...
Страница 22: ...22 Installation Note N5242 90120 All Instruments Figure 5 Attenuators and Bypass Switches Assembly ...
Страница 27: ...Installation Note N5242 90120 27 All Instruments Figure 8 A22 Splitter Installation ...
Страница 30: ...30 Installation Note N5242 90120 All Instruments Figure 9 Noise Receiver Board Installation ...
Страница 35: ...Installation Note N5242 90120 35 All Instruments Figure 11 New Test Set Cable Installation Part 2 ...
Страница 37: ...Installation Note N5242 90120 37 All Instruments Figure 12 Power Supply Replacement ...
Страница 39: ...Installation Note N5242 90120 39 All Instruments Figure 13 Lower Front panel Overlay Replacement ...
Страница 48: ...48 Installation Note N5242 90120 All Instruments ...
Страница 49: ...Installation Note Xxxxx xxxxx 3 ...