Keysight E1412A 6 1/2 Digit Multimeter Service Guide
29
Performance Verification
Verification Tests
DC Current Gain Verification
Connect the DC Standard across the Keysight E1412A I and LO Input terminals
as shown in Figure 4-4.
1
Set up the multimeter as follows: Configure for DC current, 10mA
CONF:CURR:DC 0.01
2
Set the DC Standard output to 10 mA.
3
Perform the measurement using the READ? command.
4
Verify the result is within specified limits and record the result.
5
Change ranges using CURR:RANG <range> and make a measurement for
each DCI input and range shown in Table 4-2 verifying the result is within
specified limits. Record the result.
Figure 4-4
DC Current Gain Test Setup.
Содержание E1412A
Страница 1: ...Keysight E1412A 6 1 2 Digit Multimeter Service Manual 75000 Series C ...
Страница 2: ......
Страница 6: ...vi ...
Страница 12: ...xii Keysight E1412A 6 1 2 Digit Multimeter Service Guide ...
Страница 22: ...16 Keysight E1412A 6 1 2 Digit Multimeter Service Guide Operating Instructions Warnings and Cautions ...
Страница 74: ...68 Keysight E1412A 6 1 2 Digit Multimeter Service Guide Adjustments CALibration ...
Страница 80: ...74 E1412A 6 1 2 Digit Multimeter Service Guide Backdating ...
Страница 117: ...110 E1412A 6 1 2 Digit Multimeter Service Guide Keysight E1412A Multimeter Error Messages Execution Errors ...
Страница 118: ......