
M9506A-BC1 5-Slot AXIe Chassis with Integrated Controller User Guide
17
Introduction
1
To Power Up the Chassis
1. Plug-In Chassis
Using the supplied cord, connect the chassis to an
appropriate AC power main. Use with a ground-fault circuit interrupter (GFCI) is
not recommended.
2. Close Circuit Breaker
Close the rear panel circuit breaker (ON position).
3. Press On/Standby Button
Press the ESM’s
ON/STANDBY
switch. It should
light when depressed
The
STATUS
light in the ESM’s
ON/STANDBY
switch cycles as follows:
To Power Down the Chassis
For routine power-down or to cycle power to the chassis, momentarily (< 5
seconds) press the chassis
ON/STANDBY
switch. The main chassis fans gradually
drop in speed to off, and the power supply unit (PSU) fans gradually return to idle
speed as the PSU cools. This is normal.
Status Color
Flash Rate
Chassis Power
State
Description
Off
Off
Chassis is powered off
RED
1 flash every 5 seconds
Off
Fault - Power Supply Unit (PSU) Over Temperature
2 flashes every 5 seconds
Off
Other PSU fault
3 flashes every 5 seconds
Off
ESM/Chassis Power Fault
4 flashes every 5 seconds
Off
ESM/Chassis Over Temperature Fault
Solid (no flashes)
On
Unrecoverable alert
GREEN
1 second on, 1 second off
On
1. Chassis is powered on but not ready for
enumeration or
2. Self test error
0.5 second on, 0.5 second off On
Power button has been pushed and chassis is
shutting down
Solid (no flashes)
On
Chassis is powered on and ready for enumeration
Содержание M9506A-BC1
Страница 1: ...Keysight M9506A BC1 5 Slot AXIe Chassis with Integrated Controller User Guide...
Страница 22: ......
Страница 42: ......
Страница 94: ......