6
Screw in and tighten the long fastening
screws into the upper sleeves.
Screw in and tighten the short fastening
screws into the lower sleeves.
If appropriate, install any accessories in-
cluded in the scope of delivery, such as a
towel rod, (see separate instructions).
Mount the upper fastenings (see Fig. 6–9)
Mark the drill holes (see Fig. A).
Drill the holes and insert the anchors.
At the wall adapters screw out the securing
screws and pull out the retainers.
Screw on the wall adapters with hexagon
socket screws. Take the position of the drill
hole into account.
Insert the retainers into the wall adapters.
Take the position of the openings into ac-
count.
Only screw on the retainers handtight with
the securing screws. This allows the retain-
ers to still be moved for alignment.
Pre-install the lower spacers (see Fig. 10–11)
Use a knife to cut the two snap-in bolts
at the second marking to the dimension
49 mm.
Install both spacers on the radiator.
Suspend and align the radiator (see Fig. 12–
15)
Suspend the radiator via the screws into
the retainers. Ensure that the radiator does
latch in.
In order to align the radiator sideways:
Slide the retainers.
In order to set the wall clearance: Pull out
or push in the retainers.
In order to set the height: Turn the adjust-
ing screw at the retainer.
Install the lower spacers and fasten the radia-
tor (see Fig. 16–27)
Turn out the lower spacers until these are
positioned flat at the wall and the radiator
hangs straight.
Tighten the upper securing screws.
Mark the lower drill holes for the spacers.
Press the locking clamp to the rear and
hang out the radiator. Put down the radia-
tor with installed heating element so that
the cable is not bent or damaged.
Drill the holes and insert the anchors at the
lower markings.
Dismantle both spacers.
►
►
►
►
►
►
►
►
►
►
►
►
►
►
►
►
►
►
►
►
►
Screw both snap-in bolts tight.
Suspend the radiator via the screws into
the retainers. Ensure that the radiator does
latch in.
Press on both cover caps and slide them to
the rear.
Press the wall support clips onto both spacers.
Cover the radiator completely with the pro-
tective packaging.
Electrical connection
Have the following activities carried out by
an electrician (in accordance with the sepa-
rate instructions):
Connection of the electrical unit
Connection of the heating element to
the electrical unit
Commissioning
Remove the protective packaging com-
pletely before final cleaning or commis-
sioning.
►
►
►
►
►
►
–
–
►
Содержание Ideos IDE10
Страница 12: ...12 RU 110 C 230 F 160115 RU BGV A3 31 25...
Страница 13: ...13 31 50 7 8 1 5 230 16 A 6 9 A 10 11 49...
Страница 22: ...22 ZH 110 C 230 F 160115 ZH BGV A3 31 25 31 50 mm 7 8...
Страница 23: ...23 1 5 230 V 16 A 6 9 A 10 11 49 mm 12 15 16 27...
Страница 27: ...27 160115 EL BGV A3 31 25 kg 31 50 mm 7 8 bar 1 5 230V 16 A...
Страница 28: ...28 6 9 A 10 11 49 mm 12 15 16 27...
Страница 29: ...29 mm 50 7 8 5 1 A 16 V 230 9 6 A 11 10 mm 49 15 12 26 16...
Страница 30: ...30 FA FA F 230 C 110 160115 9 31 25 31...
Страница 32: ...32 x x 4 6 10 6 1 2 x x x 10 80 2 3 1 2 1 x 4 x 6 x 1 2 1 2 3 4 5 6 7 8 9...
Страница 33: ...33 x 49 x 1 2 x x 4 x x 4 x x 2 1 2 10 11 12 13 14 15 16 17 18 19...
Страница 34: ...34 6 60 1 2 x 15 x 2 1 x x x x 20 21 22 23 24 25 26...