![background image](http://html2.mh-extra.com/html/keithley/s540/s540_administrative-manual_3932695043.webp)
In this section:
Introduction .............................................................................. 3-1
Initial equipment startup ........................................................... 3-1
System startup ......................................................................... 3-2
Before starting system software ............................................... 3-3
Start the KTE software ............................................................. 3-4
Start the ACS software ............................................................. 3-5
Shut down using ACS .............................................................. 3-5
Shut down using KTE ............................................................... 3-6
Emergency OFF button ............................................................ 3-6
Safety interlocks ....................................................................... 3-7
LO patch panel ....................................................................... 3-11
Prober safety .......................................................................... 3-11
Network information ............................................................... 3-12
Introduction
All of the instruments in the equipment rack are connected to one power distribution unit (PDU), which
is in the back of the cabinet.
Follow the instructions in the following topics to start up your system and software.
Initial equipment startup
To begin equipment startup:
1.
Check that all power cords for the system cabinet are connected to AC power.
Make sure that the circuit breaker on the power distribution unit (PDU) is in the ON position.
Section 3
Equipment startup