S540 Power Semiconductor Test System Administrative Guide
Section 2: S540 site preparation and installation
S540-924-01 Rev. D / January 2019
2-11
11. With two people, slide the S540 system cabinet down the ramp.
Figure 14: Rolling the system down the ramp
12. Remove the tape from the packing material using scissors, taking care not to scratch the S540
system cabinet.
Figure 15: Cutting the wrap off the system
13. Move the S540 system cabinet to its final destination.
The system cabinet is shipped from the factory with all of the instruments installed. Most equipment
connections and wiring of instruments in the system cabinet was done at the factory.