S540 Power Semiconductor Test System Administrative Guide
Section 2: S540 site preparation and installation
S540-924-01 Rev. D / January 2019
2-7
5.
Remove the padding from the front of the S540 system cabinet.
Figure 7: Removing the padding
6.
Remove the crate clamps and slide the outer box cover off the crate.
Figure 8: Sliding the outer box off the crate