![background image](http://html2.mh-extra.com/html/keithley/s540/s540_administrative-manual_3932695019.webp)
Section 2: S540 site preparation and installation
S540 Power Semiconductor Test System Administrative Guide
2-8
S540-924-01 Rev. D / January 2019
7.
Make sure that you retract the leveling feet on the bottom of the system (next to the casters) to
put weight on the casters and prepare the system to be rolled down the ramp.
Figure 9: Leveling feet