![background image](http://html2.mh-extra.com/html/keithley/s540/s540_administrative-manual_3932695015.webp)
Section 2: S540 site preparation and installation
S540 Power Semiconductor Test System Administrative Guide
2-4
S540-924-01 Rev. D / January 2019
Also, check the "TIP N TELL" indicator to ensure that the crate has not been tipped over (see the
following figure).
Figure 3: S540 crate tipping indicator
Carefully remove all system components from the crate. While unpacking, make sure there is no
component damage. Report any damage to the shipping agent immediately. Please reuse or recycle
packaging materials in accordance with your local requirements.
You need at least two people to unpack and move the S540 system cabinet.