REQUIRED TEST THERMOSTAT
Multimeter (for testing continuity)
CHECKING CONTINUITY WITH THE MULTIMETER
1. Rotate the thermostat shaft until an audible click
is heard.
2. Rotate the thermostat shaft left and right ten
times causing the switch to click on and off ten
times, while using the Multimeter to verify continuity.
3. If the switch does not show continuity during all
ten trials, replace the thermostat.
DISASSEMBLING THE THERMOSTAT WILL VOID THE
THERMOSTAT WARRANTY.
1. Set compression ring onto capillary end of bulb
fi nger tight, 1/2" from end of capillary.
2. Insert new thermostat bulb through control panel
back.
3. Apply oil resistant fl exible sealant onto compres-
sion fi tting thread before installing fi tting into fryer
vessel.
4. Position bent portion of bulb against far right heat
transfer tube and install compression fi tting snugly
into fryer vessel.
5. Adjust bulb so at least 2" of bent portion of it is
next to heat transfer tube and tighten compression
nut onto compression fi tting for fryer 10x11, 18 &
up. The end of thermostat bulb should touch the
burner tube for 14" fryers.
6. Replace burners.
7. Replace control panel back.
8. Slide back fabric shield over capillary and
carefully coil capillary. Avoid crimping.
9. Reconnect wires to thermostat body.
10. Replace two screws which hold thermostat body
to control panel.
11. Replace control panel.
12. Replace three retaining screws and washers
which hold dial plate in place.
13. Replace thermostat knob.
14. Connect electric power source. Turn on gas
and pilots.
15. Boil out fryer.
16. Refi ll fryer with oil to “fi ll level line”.
17. Start fryer, preheat and calibrate with
thermometer.
WARRANTY REPAIRS
Keating’s warranty begins with the date of installation.
In the event that your Instant Recovery® Fryer, under
warranty, needs repairs other than routine cleaning,
you are requested to contact KEATING OF CHICAGO,
INC. (1-800 KEATING).